Strona główna Forum
It is absolutely necessary to have precise control over the temperature of the die casting surface in order to produce components made of zinc alloy that are of a high quality. In order to be able to manufacture components, this is something that is absolutely necessary. In addition to that, the topic of the amount of time necessary for filling a die casting will be discussed in greater depth throughout the entirety of this guide.
Where t is the filling time in seconds, q is the metal volume in cubic meters, V is the filling speed in meters per second, and ag is the cross-sectional area of the inner gate in square centimeters. Where t represents the amount of time spent filling in seconds, q represents the volume of metal in cubic meters, and V represents the amount of time spent filling in meters per second. Where t is the total amount of time spent filling, measured in seconds; q is the total volume of metal, measured in cubic meters; and V is the total amount of time spent filling, measured in meters per second.
When making die castings, it is absolutely necessary for the liquid metal to fill the cavity of the mold as quickly as is physically possible to do so. This is one of the requirements that must be satisfied before moving on. The amount of time required to fill zinc alloy die cast workpieces can range anywhere from 6 milliseconds to 40 milliseconds, depending on the characteristics of the workpiece itself. When it comes to mechanical workpieces or those that need electroplating, the amount of time China die casting mold takes to fill a mechanical workpiece is less than 20 milliseconds, and the amount of time it takes to paint a mechanical workpiece is less than 40 milliseconds. Both of these times are measured in milliseconds. Milliseconds serve as the unit of measurement for both of these times.
The amount of time that has passed during which the pressure has remained constant throughout that time period.
This is a precondition for continuing with the process. In addition, the volume loss of the die casting that takes place during the process of solidification has to be continuously compensated for by the liquid. It is necessary to carry out these steps in order to guarantee that the casting will turn out accurately. The casting that is produced as the end result of the process will have a structure that is quite dense as a result of the end result of the process because of this reason. If there are many voids and cavities found in the middle of the nozzle material, this is an indication that there were many more voids than there should have been. There should not have been as many voids as there were. This may take place if the pressure holding pressure is significantly lower than what is considered normal. the longest period of time that mold can be kept before it starts to lose its viability as a viable organism.
After the injection process has been finished, the temperature in the cavity of the mold will begin to decrease, which will cause the liquid metal that was contained within the cavity to begin to solidify and cool down. After the cavity has been brought down to a temperature of about 73 degrees Celsius (approximately 77 degrees Fahrenheit), this procedure will be finished. After the temperature of the casting has been lowered to a predetermined level and the casting has achieved a predetermined level of mechanical strength, the casting can then be removed from the mold. However, in order to accomplish this, the casting must first reach the specified level of temperature before you can proceed. The amount of time that must elapse following the pressure holding time before the mold can be opened is referred to as the mold retention time. This time must pass before the mold can be opened. It is possible to determine whether or not the recommended amount of mold retention time has been achieved by conducting an analysis of the degree to which the die-casting has been deformed. Mold temperature
When trying to determine the overall quality of die castings, one of the most important factors to take into consideration is the temperature of the mold itself.
Die temperature range of die casting mold:160 - 220 ℃
Electroplating can be completed for castings at temperatures ranging from 180 to 220 degrees Celsius, depending on the specifics of the process.
This causes the process to begin much earlier than it should. Because of this, the process starts a great deal earlier than it should have. As a result of this, it is much simpler for flaws in the product, such as flow marks and surface return cold lines, to become noticeable after it has been manufactured. There are a lot of examples, like flow marks and surface return cold lines, among others. The observed phenomenon can be explained by the fact that the temperature of the mold is higher than that of the people, as this is what's causing the difference. This makes it very easy to produce shrinkage as well as porosity.
These two methods are the only ones that can be utilized in order to keep the temperature consistent throughout the entire environment. In addition, it is of the utmost importance to ensure that the temperature of the die casting China is not affected by any factors that are external to the mold. This is because the temperature of the mold can have a significant impact on the quality of the casting. Because of the potential for this kind of change to have catastrophic repercussions, this is of the utmost concern.